Healthcare Engineering

Healthcare
previous arrowprevious arrow
next arrownext arrow

Healthcare Engineering

Our EPES Healthcare Engineering Division provide Technical Engineering Consultancy services to Hospital Management and Administrators, Healthcare Providers, Operators and Asset Management staff at Local District, State and National levels.

EPES specialise in trouble-shooting new and existing Hospital and Healthcare Facilities, working with Health Infrastructure and Local Health Districts to develop solutions for major rectifications, refurbishments and upgrades

Hospital and Healthcare facilities are governed by National, State and Local Guidelines, Standards and Codes which must be strictly adhered to in order to deliver safe and reliable assets.

We understand the interrelationships between Clinical Operations and pragmatic services system design in Critical Clinical Environments.

Key Considerations for Hospitals, Aged Care or Healthcare Facilities

1.  24/7 Availability of Services Systems

2.  Asset Management Systems and Maintenance

3.  Compliance with Regulatory Building Code Requirements

4.  Consequences and Risks of Critical Clinical Areas

5.  Funding and the application and Reporting process

6.  Futureproofing, through identifying true service life of Assets

7.  Safety of Staff, Patients and the Public

8.  Simplifying Commissioning Processes 

9.  Sustainability and Energy Efficiency

10.  Understanding the Challenges of Maintainability in large Complex Buildings

Operation of Critical Clinical Areas

At EPES we provide our clients with reliable solutions to ensure high risk, Critical Systems and Clinical Areas are safe and remain fully operational.  

Our professionally qualified engineers are able to manage, rectify, upgrade and certify compliance to ensure the continual operation of these Critical Systems and Clinical Areas, through addressing the following:

Air Quality

Critical Temperature and Humidity Reliability

Prevention of Extensive Mould Growth Within Critical Clinical Areas

Prevention of Airborne Pathogens and Bacteria

Compliance

Compliance requirements are wide and varied, EPES offer extensive Compliance Audits that define and articulate specific compliance requirements at the initial stages of each project, that include:

AIRAH Special Technical Group Committee Representation

EPES are represented on the Technical Committee for the AIRAH Special Technical Group – Infection Control & Operating Theatre HVAC Design.

EPES regularly attend meetings with Hospital and Healthcare facility management and other stakeholders to provide guidance on non-compliances to enable clinical staff to assess and quantify risks to staff, patients and the public.

Our engineering team assist management and other stakeholders at any or all of the 3 following stages:

Stage 1. Initial Assessment – An initial assessment is the critical first stage, Hospital and Healthcare Facility clinical staff and stakeholders are engaged in a consultation process where a decision is made to address non-compliances and rectify critical rooms and areas.

Stage 2. Detailed Design Process – Where each of the compliance requirements are addressed and design documentation is prepared to understand the level of interruption and construction cost budget.

Stage 3. Management – Working closely with contractors and Hospital and Healthcare Facility management and staff to effectively manage construction works to ensure compliance objectives are achieved, with sign off reports and final as-built documentation.

EPES Hospital and Healthcare Engineering Capabilities

Our core capabilities are centred Mechanical Services, that include: 

EPES Hospital and Healthcare Engineering Division Services

EPES offer extensive Technical Engineering services in complex Hospital and Healthcare Engineering and Design in the following areas:

Related Projects

Gosford Hospital

Operating Theatre Upgrade

Grafton Hospital

Central Chiller Upgrade

Inverell Hospital

Redevelopment Stage 1B

Nepean Blue Mountain LHD

Asset Data and Life Cycling

Port Macquarie Base Hospital

PACS and Renal Redevelopment

Gosford Hospital

Operating Theatre Upgrade

Grafton Hospital

Central Chiller Upgrade

Inverell Hospital

Redevelopment Stage 1B

Nepean Blue Mountain LHD

Asset Data and Life Cycling

Port Macquarie Base Hospital

PACS and Renal Redevelopment

Gosford Hospital

Operating Theatre Upgrade

Grafton Hospital

Central Chiller Upgrade

Inverell Hospital

Redevelopment Stage 1B

Nepean Blue Mountain LHD

Asset Data and Life Cycling

Port Macquarie Base Hospital

PACS and Renal Redevelopment

Major Clients

Complete Form Below

Download EPES Capability Statement