Data Centres

Hospitals & Healthcare
previous arrowprevious arrow
next arrownext arrow
EPES Data Centres Sector

Data Centres

In the ever-changing world of information and communications technology, huge infrastructure provisions are required to store information that is being produced at unprecedented rates across the world.

As a result, this has necessitated the construction of many large Data Centres.

EPES utilises cost benefit analysis to best determine project solutions and opportunities, whilst taking the time to understand the end users’ drivers and priorities

Data Centres have both many challenges and many opportunities, due to their energy intensity and heat production.

Key Considerations for Data Centres

1.  Battery storage

2.  Cool and warm air distribution principles

3.  IT equipment (racks) and configuration

4.  Opportunistic re-use of waste heat

5.  Maximum efficiency of cooling systems through smart functional controls

6.  Service levels and redundancy

EPES Services

Hospital and Healthcare Services Include

Asset Management

> Asset Data Capture
> Asset Management Systems
> Maintenance Plan Reviews
> Physical Condition Audits

Building Services

> Building Code of Australia Compliance
> Building Management and Control Systems (BMCS)
> Carpark Ventilation
> Chilled Water Systems
> Concept and Feasibility Design
> Consulting
> Critical System Design
> Design Compliance Audits
> District Cooling and Heating Systems
> Energy Modelling
> Engineering Design
> Environmentally Sustainable Design (ESD)
> Greenstar
> Heating Water Systems
> Heating, Ventilation and Air Conditioning (HVAC)
> Medical Gases
> Natural Ventilation Systems
> REVIT Modelling
> Section J Assessments
> Smoke Control Systems
> Steam Systems
> Ventilation Exhaust Systems

Commissioning Assistance

> Certification
> Commissionability Reviews
> Commissioning Planning
> Supervision
> Witness Testing 

Construction and Design Consulting

> Design Management
> Interface Management
> Program Development and Monitoring
> Project Delivery and Completion Management
> Risk Assessments
> Stakeholder Engagement
> Technical Scoping

Digital Engineering

> 3D Modelling
> Building Information Modelling (BIM)
> Project Information Databasing

Independent Reviews and Audits

> Code Compliance Audits
> Due Diligence Assessments
> Energy Audits
> Failure Troubleshooting
> Feasibility Studies
> Forensic Engineering
> Independent Representation
> Maintenance Plan Compliance
> Physical Plant Condition Audits
> Rectification Design
> Site Inspections
> Testing

Project Management

> Construction Planning
> Construction Supervision
> Design Management
> Life Cycle Analysis
> Masterplanning
> Safety in Design
> Tender Evaluations
> Value Engineering (VE)

Specialist Analysis

> Computation Fluid Dynamics (CFD)
> Finite Element Analysis (FEA)
> Hydraulic Analysis
> Structural Analysis

Related Projects

Port Macquarie Base Hospital

Mental Health Expansion

Gosford Hospital

Operating Theatre Upgrades

Nepean Blue Mountains LHD

Asset Data and Life Cycling

Hornsby Hospital

Mental Health Unit

Inverell Hospital

Redevelopment

Related Projects

Port Macquarie Base Hospital

Mental Health Expansion

Gosford Hospital

Operating Theatre Upgrades

Nepean Blue Mountains LHD

Asset Data and Life Cycling

Hornsby Hospital

Mental Health Unit

Inverell Hospital

Redevelopment

Port Macquarie Base Hospital

Mental Health Expansion

Gosford Hospital

Operating Theatre Upgrades

Nepean Blue Mountains LHD

Asset Data and Life Cycling

Hornsby Hospital

Mental Health Unit

Inverell Hospital

Redevelopment

Major Clients

Complete Form Below

Download EPES Capability Statement