Gosford Hospital – Operating Theatre Upgrade

Gosford Hospital – Operating Theatre Upgrade Slide 1
previous arrowprevious arrow
next arrownext arrow

Gosford Hospital - Operating Theatre Upgrade

Mechanical Engineering

EPES were engaged to undertake compliance reviews and testing of existing operating theatres precinct and baseline performance prior to opening of additional theatres. This included verification of theatre air handling systems with regards to NSW Health legacy and current (AusHFG) Engineering Services Guidelines as well as legacy and current Australian Standards.

Scope generally included:

Project Information

Location: Gosford, New South Wales, Australia
Client: Central Coast Local Health District
Engagement: Design Consultant
Sectors: Buildings, Hospitals and Healthcare
Services: Asset Management, Building Services, Commissioning Assistance, Construction and Design Consulting, Independent Reviews and Audits
Year: 2018

EPES provided recommendations and contract documentation for works to be undertaken to upgrade operating theatres precinct to maintain compliance with current AusHFG requirements. EPES provided ongoing technical support and guidance.

The Problem

Performing any works or investigations within an operating theatre precinct presents many logistical challenges in terms of access, interruptions and critical performance of air handling systems in these areas. Also, given the age of the equipment serving the existing theatres technical data was difficult to source from suppliers and manufacturers (they don’t exist anymore).

EPES have been involved in many projects where upgrade works have not considered the original design intention of existing systems. This creates expensive and disruptive problems negatively effecting system reliability and performance.

Analysis and Implementation

Communication with stakeholders is crucial to gaining the required access to critical areas such as operating theatre precincts, as well as being highly flexible with timing and short notice requirements (e.g. emergency theatre demands). 

Additionally, at EPES we have engineers who’ve had experience working with air handling systems for over 40 years. This understanding enables us an advantage in being able to trouble shoot and define system operation largely in the absence of as-built documentation and supplier technical literature. 

Outcome

EPES were able to prepare contract design documentation that supplemented the intended original operation of the system, whilst upgrading to current performance requirements.

Using experience engineers with a track record of working and modifying legacy systems is critical for successful outcomes.

Melbourne Metro – Tunnel

Melbourne Metro – Tunnel Slide 1
previous arrowprevious arrow
next arrownext arrow

Melbourne Metro Tunnel

Temporary Works Engineering Packages

EPES were engaged by CYP to undertake various design packages related to temporary works during construction, including:

​1. Concept design and planning assistance for pressurised services (dewatering, compressed air, recycled water and potable water) used in excavation works at the CBD North and South zones (covering 8 shafts and interconnecting tunnels)

2. Engineering design for adit and cavern hooks, cross over supports and shaft brackets, and verification of shaft service ladders and top shaft brackets

Generally, design packages incorporated engineering analysis, reviews for constructability, safety in design and coordination with construction teams to ensure that design was in alignment with site expectations.

Project Information

Location: Melbourne, Victoria, Australia
Client: Cross Yarra Partnership (CYP)
Engagement: Engineering Consultant
Sectors: Industrial, Rail Infrastructure (Tunnels)
Services: Construction and Design Consulting, Independent Reviews and Audits, Infrastructure Engineering, Piping Engineering, Specialist Analysis, Water and Waste Water
Year: 2019

The Problem

Pressurised services are complex on large construction projects and can be high risk in the event of a failure. Identifying the correct design loadings, as well as risks associated with operation in a live construction environment were considered in the engineering analysis. Relative conservatism is this type of design package is pragmatic, whilst understanding the temporary nature of the works.

Analysis and Implementation

EPES performed analysis is accordance with the mandated standards and codes such as AS1170 for loading, AS4041 for pressure piping and AS4100 for steel structures. Close consultation with site construction enabled coordination with actual installation constraints as well as a means of clarifying design cases, limitations and risks. 

Outcome

The outcome was a comprehensive design package with appropriate levels of buy in from temporary works managers, site teams and procurement. Design documents were prepared well ahead of the being required for site works which enabled proper planning to be undertaken and communication to respective site personnel.

Well organised and planned design work dramatically reduces both technical, safety and commercial risks for all stakeholders on a project.  